Phoenix, Arizona
4801, 4805, 4809 and 4811 East Thistle Landing Drive
Property was acquired in May 2024. A five-building, 1M square foot data center campus was approved by the City Phoenix with a flexible site plan, allowing for changes to the layout and building sizes. Critical power of 184MW (257MW total utility power) will be delivered from an onsite SRP substation in 2026 Q4.
Property Features
- Excellent access to Interstate 10 and Loop 202 connecting the southeast valley and surrounding areas
- Includes the installation of an on-site substation, upgraded architectural features, and a 2+ acre community park
- Accommodates the full 184 MW of critical capacity in five buildings built in two phases